I'm going to build. What electrical provisions can I make already?

  • You don’t need to provide the wiring yourself. However, it’s a good idea to install a conduit to the location where the charging station will be placed.
  • If you decide to install the wiring yourself, please consider the following:
    • Always install a three-phase cable of at least 6 mm² (5G6) thickness. For lengths greater than 70 meters, we recommend using 10 mm² (5G10).
    • Most of our charging stations can deliver 3-phase 22 kW. Therefore, we recommend laying future-proof wiring. Typically, we install a 5 x 6 mm² (5G6) YMVK (AS) cable or thicker if necessary.
    • Also, run a Cat. 5 UTP cable to the charging station.
    • Ensure that the power cable starts from the main distribution board and goes to the location of the charging station. Leave an extra meter on each side for the connection.
Last updated byadmin